Вопросы и ответы

Дом » FAQ

Дом / О нас / Вопросы и ответы
Frequently Asked Questions

Clear answers before a tooling decision.

Start with the information procurement and engineering teams typically need for an injection mold RFQ, then confirm project-specific details with us.

Ask a project question ↗

CMM inspection equipment on GPTMOLD's website

RFQ preparation

Before requesting a quote

What should I send for an injection mold quotation?

Share a 3D model and 2D drawing where available, спецификация смолы, expected volume, target appearance, critical dimensions and any assembly or regulatory requirements. State which items are fixed and which are open to engineering review.

Can GPTMOLD quote from a concept or incomplete drawing?

You can start a discussion with preliminary information. A reliable tooling scope and quotation depend on the missing geometry, материальных, tolerance and acceptance details being resolved.

How should I compare quotations from different mold suppliers?

Use the same drawing revision and requirement set for each supplier. Compare the proposed mold concept, cavity count, included trial work, inspection scope, expected deliverables and assumptions alongside price.

Инженерный обзор

Before mold design is released

What does a DFM review cover?

Depending on the part, the review may address parting line, gate position, уклон, подрезы, выбрасывание, wall transitions and other design features that affect tooling or molding. The review scope should be agreed for the project.

Who approves proposed part or mold changes?

Customer approval should be obtained for changes that affect part design, appearance or agreed requirements. Keep a record of the drawing revision and decisions before moving into the next stage.

Can optical appearance requirements be included?

Да. Provide defined optical, surface and visual acceptance criteria with the part data so these can be assessed during engineering review and sample evaluation.

Trials and acceptance

Before approving samples

What should be checked during a mold trial?

Trial evaluation should follow the agreed part requirements. Depending on the project, this can include dimensions, внешний вид, подгонку, material behavior and process-related observations. Record any changes needed before the next trial.

Will every project receive the same inspection report?

Report content depends on the drawing, критические характеристики, sampling plan and customer agreement. Specify required report formats and measurement points during the RFQ or project review.

How are shipment and handover requirements defined?

Agree the destination, packing needs, samples, inspection records, tooling documents and delivery terms in the project scope. Confirm the final handover list before dispatch.

Still deciding?

Make the next question specific to your part.

A drawing revision, photo, test result or requirement sheet gives the technical discussion a shared reference. Send the information you have and identify the decision you need help making.

Связаться с GPTMOLD ↗

Mold trial machine imagery from GPTMOLD

  • Контактная информация

    Отправить по электронной почте: sales@gptmold.com

    Рабочие часы: Пн – Сб, 8:00 AM – 6:00 PM (GMT+8)

  • Доверие & Соответствие