Start with the information procurement and engineering teams typically need for an injection mold RFQ, then confirm project-specific details with us.

Share a 3D model and 2D drawing where available, spécification de la résine, expected volume, target appearance, critical dimensions and any assembly or regulatory requirements. State which items are fixed and which are open to engineering review.
You can start a discussion with preliminary information. A reliable tooling scope and quotation depend on the missing geometry, matériaux, tolerance and acceptance details being resolved.
Use the same drawing revision and requirement set for each supplier. Compare the proposed mold concept, cavity count, included trial work, inspection scope, expected deliverables and assumptions alongside price.
Depending on the part, the review may address parting line, gate position, dépouille, undercuts, de l’éjection, wall transitions and other design features that affect tooling or molding. The review scope should be agreed for the project.
Customer approval should be obtained for changes that affect part design, appearance or agreed requirements. Keep a record of the drawing revision and decisions before moving into the next stage.
Oui. Provide defined optical, surface and visual acceptance criteria with the part data so these can be assessed during engineering review and sample evaluation.
Trial evaluation should follow the agreed part requirements. Depending on the project, this can include dimensions, apparence, l'ajustement, material behavior and process-related observations. Record any changes needed before the next trial.
Report content depends on the drawing, les caractéristiques critiques, sampling plan and customer agreement. Specify required report formats and measurement points during the RFQ or project review.
Agree the destination, packing needs, samples, inspection records, tooling documents and delivery terms in the project scope. Confirm the final handover list before dispatch.
A drawing revision, photo, test result or requirement sheet gives the technical discussion a shared reference. Send the information you have and identify the decision you need help making.
